JIANGSU LIANZHONG METAL PRODUCTS (GROUP) CO., LTD

JIANGSU LIANZHONG METAL PRODUCTS (GROUP) CO., LTD

Manufacturer from China
Verified Supplier
2 Years
Home / Products / High Pressure Tank /

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

Contact Now
JIANGSU LIANZHONG METAL PRODUCTS (GROUP) CO., LTD
Visit Website
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MrAlex
Contact Now

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

Ask Latest Price
Video Channel
Brand Name :LIANZHONG
Model Number :JH200,JH300,JH500
Certification :ISO9001 SGS
Place of Origin :China
MOQ :1
Price :negotiable
Payment Terms :L/C, T/T, D/P, D/A
Supply Ability :1000SETS PER MONTH
Delivery Time :10DAYS AFTER CONFIRM ORDER
Packaging Details :Wooden package or as customized
kettle Length :1000-12000mm or as customized
Installation Method :Vertical
Storage Medium :Moncombustible/Nontoxic
Core Components :Pressure vessel
Test Pressure :10.1MPa
Outer Material :SS304/316L
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
What is the difference between high pressure and low pressure tanks?
Low Pressure vs. High Pressure Scuba Diving Tanks | Santa ...
Low pressure tanks have 2400 or 2640 psi, while high pressure tanks have 3300, 3442, or 3500 psi. 3000 psi is considered a standard pressure. Low pressure tanks hold less air and take up more space than high pressure tanks. However, they also experience less wear and tear and take less time to fill.
Product Catalogue
Product Name
Steel Gas Cylinder
Water Capacity
From 10L-60L
Working Pressure
150bar/200bar
Test Pressure
200bar/300bar
Standard
(TPED)EN ISO9809-1/(TPED)EN ISO9809-3
European standard countries
Slovakia, Czech Republic, Finland, Poland, United Kingdom, Netherlands, Iceland, Greece, and so on
Certificate
TUV /TPED/BV/TS
Color
Blue/Gray/Green/As Request
OEM Design
Logo/Sticker/As Request
handle
round cap/metal handle/Tulip handle/As Request
Outer diamater
116mm/140mm/159mm/204mm/232mm/267mm/As Request
Standards or specifications that our products can comply with
Product category Design Code Certifications
Air Receiver ASME VIII-1/GB150 ASME U/UM, PED Module H/H1/G/B+F, CRN, EAC, DOSH, MOM, AS1210,TS
Liquid Receiver ASME VIII-1/GB150 ASME U/UM, PED Module H/H1/G/B+F, CRN, EAC, DOSH, MOM, AS1210,TS
Separator ASME VIII-1/GB150 ASME U/UM, PED Module H/H1/G/B+F, CRN, EAC, DOSH, MOM, AS1210,TS
Adsorption Tank ASME VIII-1/GB150 ASME U/UM, PED Module H/H1/G/B+F, CRN, EAC, DOSH, MOM, AS1210,TS
Heat Exchangers ASME VIII-1/GB150/GB151 ASME U/UM, PED Module H/H1/G/B+F, CRN, EAC, DOSH, MOM, AS1210,TS

Product Description

WHAT IS AAC?
The AAC production process includes raw material preparation, batching and mixing, pouring, precuring, cutting, autoclaving, and packing. With decades of experience in serving the AAC blocks production machinery industry, we can supply customers with quality AAC block production lines with capacity ranging from 80,000m3 to 400,000m3 per year.
HOW TO START THE PROJECT?
Lianzhong is a professional laboratory center will test the customer's raw materials to provide the formula design, we will also offer the customized plant layout and the related design documents. All the equipment will be debugged before the delivery. We'll also arrange professional project manager and engineers for site installation supervision and local training to ensure the successful production start-up.
In this industry, We have more than 20 years of experience. In 2018, our manager director gave technical speech on 6th International Conference on Autoclaved Aerated Concrete in German. Last year, we hosted the 39th annual meeting of China Aerated Concrete Association and the 2019 International Forum, which attracted more than 800 participants worldwide.

The large size of the tank allows for the production of large-scale carbon fiber products, such as aerospace components, automotive parts, and sporting goods. The tank's spacious interior provides ample space for the placement of molds and ensures uniform heat distribution during the curing process.

Overall, the large carbon fiber curing molding high temperature and high pressure tank is an essential tool for manufacturers in the carbon fiber industry. Its advanced features and capabilities enable the production of high-quality carbon fiber products that meet the stringent requirements of various industries.

No Item Data
1 Volume 0.5m³ to 2000m³
2 Temparature -30℃ to 150℃
3 Pressure -1Mpa to 0.8Mpa (Customized)
4 Craft sprayingroller coatingplate liningisostatic pressing
5 Housing material carbon steel304 stainless steel316 stainless steel
6 Lining material PTFEETFEPFAPOPP
7 Applicable industries photovoltaicsemiconductorchemicallithium batterymetallurgyenvironmental protectionetc
8 Features high temperature resistance,corrosion resistance,negative pressure resistance

Details technical

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

Specification

1. Capacity:50L-50000L
2. Materical:SS304 and SS316
3. Single layer/Double layers/Three layers
4. Polished inside and outside
5. Quick open manhole
6. Agitator Power:0.25-15KW

Application of Resin plant
Chemical Machine Resin Plant is the key equipment for producing all kinds of resins, such as Alkyd resin, Acrylic resin, PET resin, epoxy resins, ABS resins, Polyester resin, Unsaturated polyester resin, , Amino resin, curing agent. PVA Emulsion/Acrylic emulsion/polymer emulsion/water base PU
The whole set of equipment includes reactor, vertical fractionating column, horizontal condenser, water storage tank, oil spill tank and piping (dilution kettle). All parts of the equipment that contact with the material are all made by stainless steel.

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

Detailed Photos

Steel Gas Cylinder High Pressure Tank For Water InfrastructureSteel Gas Cylinder High Pressure Tank For Water InfrastructureSteel Gas Cylinder High Pressure Tank For Water Infrastructure

Packaging & Shipping

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

More Products

Steel Gas Cylinder High Pressure Tank For Water Infrastructure

FAQ

Q1: How long is the warranty of the AAC production line?

A1: Our warranty period is one year generally.

Q2: Can l visit your factory?
A2:Yes. We warmly welcome you to visit our factory.
We will take you to our customer site to have a real look.

Q3: Do you provide equipment operation training?
A3:Yes. We can send professional engineers to the working site for installation, adjustment,and operation training. All of our engineers have passports.

Q4: Do you provide whole AAC production line flow chart?
A4:Yes. Our experienced engineers are specialized in designing process flow for various project.

Q5: Can you test our samples?
A5:Yes. You can send your samples to us for test and analysis.

Q6. How about price?
A6:Yes, we are factory and are able to give you the lowest price than market one and we have a policy that “for saving time and absolutely honest business attitude, we quote as low as possible for any customer, and discount can be given according to quantity. contact us.

Inquiry Cart 0